Service Affecting - Virtus Slough - Generator Software Upgrade
Scheduled Maintenance Report for EX Networks
Completed
The scheduled maintenance has been completed.
Posted Sep 14, 2017 - 02:00 BST
Update
Please be advised that the below works have progressed slower than expected today. It is anticipated that works will continue until 02:00 14/09/2017
Posted Sep 12, 2017 - 16:15 BST
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Sep 11, 2017 - 07:00 BST
Scheduled
VIRTUS LONDON4 (Slough) have informed us that essential maintenance and upgrade work on the software which controls the on-site generator system will be conducted on Monday 11th September to Thursday 13th September between the hours of 07:00 BST and 22:00 BST.

Following the upgrade, the software will be tested to prove functionality of the on-site power generation and associated equipment. In order to mitigate the multiple service interruptions that would occur during this testing, the B power feed will be temporarily fed by the UPS backed A feed..

The changeover on the B feed will result in two small power outages on the B feed only, one at approximately 07:30 BST on Monday 11th September, and on at approximately 18:00 on Wednesday 13th September. These outages will last a few seconds only. Please make sure that all hardware is dual fed or powered from the A feed, which will remain up throughout this work.

If you have any queries, please do not hesitate to contact us.
Posted Aug 21, 2017 - 17:47 BST